Civil Works –

CC Road Laying of Road formation Spreading of Gravel for road surface, Neatly dressing for making WBM Road, Watering, Rolling including all labour charges etc., complete a. Road formation, speading of formation only. 3. Wet Mix Roads Two Layers each layer 6” Loose Thickness Compact 5” Thickness Replacement of 5rd and 6th Items. 4. C.C. Road thickness 6 inches RMC plant (Maha shakthi cement 53 grade, robo stand & dust , 20mm kankara , including bled

Civil Work –

W.B.M. Road Earth work road cutting, filling, leveling and formation for 1½ feet depth making W.B.M. Road, Watering, Rolling including all labour charges etc., a. Earth work Gravel filling or cutting upto 1½ Road area only. b. Dojing for making road leveling and labour etc. c. Watering, Rolling.

Civil Work –

BT Road a. Laying of Bitumen premix carpet of 30mm thick over WHM road, with hard mix plant hard granite metal mixed with Bitumen as tack coat, roller, compacted to the required camber and gradient including cost of material and labour etc., complete. b. Cleaning of Metal road surface for making B.T. Rood labour charges Supplying and spreading of bitumen tack coust for preparation of B.T. Road 1. Bitumen Charges 2. Labour Charges c. Supplying and spreading of Bitumen with 6 mm mental (Mixing with bitumen 6mm metal seal coast) d. Rolling charges

error: