

BT Road
a. Laying of Bitumen premix carpet of 30mm thick over WHM road, with hard mix
plant hard granite metal mixed with Bitumen as tack coat, roller, compacted to the
required camber and gradient including cost of material and labour etc., complete.
b. Cleaning of Metal road surface for making B.T. Rood labour charges
Supplying and spreading of bitumen tack coust for preparation of B.T. Road
1. Bitumen Charges
2. Labour Charges
c. Supplying and spreading of Bitumen with 6 mm mental (Mixing with bitumen
6mm metal seal coast)
d. Rolling charges
₹75.00
WhatsApp Us